Amarc Recommences Drilling at the DUKE District Reports on DUKE Deposit Winter Drilling

The current drill program follows the 2024 winter delineation drilling of the DUKE Deposit.
The current drill program follows the 2024 winter delineation drilling of the DUKE Deposit.